Verification of desgin documentation under the investment “Design and construction of the S17 expressway Garwolin – Kurów expressway – section Garwolin  (end of the bypass) – border of the Mazowieckie and Lubelskie voivodships”.

Project name

Verification of desgin documentation under the investment “Design and construction of the S17 expressway Garwolin – Kurów expressway – section Garwolin  (end of the bypass) – border of the Mazowieckie and Lubelskie voivodships”.

Description

CertusVia was rsponsible for the verification of the design documentation according the task: “Design and construction of the S17 expressway Garwolin – Kurów expressway – section Garwolin  (end of the bypass) – border of the Mazowieckie and Lubelskie voivodships with a division into two parts:

  •  Part/Contract 1 section: Garwolin (end of the bypass) – Gończyce (end of the bypass) from approx. km 49+973 to km 62+200 approx. 12,227 km ,
  • Part/Contract 2 section: Gończyce (end of the bypass) – border of the Mazowieckie and Lubelskie voivodeships from approx.. km 62+200 to approx. km 75+212 approx. 13,012 km ”

The S17 expressway Warsaw – Hrebenne  (border with Ukraine) along the  international route E372 aims to link the Warsaw agglomeration with the Lubelszczyzna and further carry traffic in the direction of Lviv. On the section between Kurów and Piaski, together with the S12 expressway, it will serve as a central transport link in the Lubelskie Voivodeship.

The verification included the following industries:

  • road;
  • bridge;
  • construction-building;
  • drainage;
  • networks, installations, equipment – telecommunication;
  • networks, installations, equipment – heating, ventilation, gas, water and sewage;
  • networks, installations, equipment – electrical and electrical power engineering.

The Ordering Party

Euroconsult Polska Sp. z o.o. (Ltd.)
99/19 Jerozolimskie Avenue
02-001 Warsaw

Start date and end date

Start date of the investment project: 22.09.2015

Planned date of completing: 22.04.2019

Contract value:

Task 1 – PLN 288 577 825,14  (gross)

Task 2 – PLN 313 625 595,57  (gross)