Verification of design documentation under the investment “Design and construction of the S5 expressway in the section from the “Nowe Marzy” interchange”. (without interchange) to the “Dworzysko” interchange (with interchange) approx. 23.3 km “.

Project name

Verification of design documentation under the investment “Design and construction of the S5 expressway in the section from the “Nowe Marzy” interchange”. (without interchange) to the “Dworzysko” interchange (with interchange) approx. 23.3 km “.

Description

Verification of design documentation prepared by the Contractor for the construction works under the investment: “Design and construction of the S-5 expressway from the “Nowe Marzy” interchange. (without interchange) to the “Dworzysko” interchange (with interchange) about 23.3 km “, in specialisations:

  • road engineering;
  • bridge engineering;
  • installation in the field of networks, systems, equipment – telecommunication;
  • installation in the field of networks, systems, equipment – heating, ventilation, gas, water and sewage;
  • installation in the field of networks, systems, equipment – electrical and electrical power engineering.

Verification included the construction and executive designs, as well as other documents of the Contractor for the construction works  – specifications, the take-off.

The Ordering Party

TPF Sp. z.o.o. (Ltd.), 22  Annopol Street, 03-236 Warsaw

Start date and end date

11.2015 – present

Contract value

PLN 374 722 113,70 (gross)