Biała Podlaska eastern bypass (bridge structures)
Project name
Biała Podlaska eastern bypass (bridge structures).
Description
Certus Via company has designed two flyovers: i.e. WD-01 and WD-02 which are part of the eastern bypass of Biała Podlaska. The project was commissioned by the Municipality of Biała Podlaska.
WD-01 – road viaduct over railway line no. 2, is a facility combined steel & ferroconcrete characterized by a lightweight construction of the bridge. The main girders are two tandems of steel plate girders. The flyover is based on solid extreme supports – reinforced concrete abutments and column intermediate supports. It will enable pedestrian and motor- vehicle traffic over the railway tracks to be carried out without collisions.
The parameters of the facility:
- overall span: 124,0 m
- span in supports: 122,5 m
- the overall width of the facility: 13,9m
- the number of bays: 3
- span of the main bay: 52,5m
WD-02 – road viaduct over Sidorska Street is a reinforced concrete structure with a typical frame structure and upper reinforced concrete transom. The viaduct is integrated in the road embankment, used to carry out without collisions pedestrian and motor- vehicle traffic over Sidorska Street in Biała Podlaska.
The parameters of the facility:
- overall span: 14,0m
- span in supports: 13,5m
- the overall width of the facility: 14,7m
The Ordering Party
The Ordering Party is The President of Biała Podlaska
Start date and end date
The beginning of design works: January 2017
The completing of design works: August 2017
Contract value:
PLN 27 511 341,94 (gross)