Bridge structures in the municipality of Kampinos
Project name
Bridge structures in the municipality of Kampinos
Description
There are six deteriorated through wear and tear bridge structures in the municipality of Kampinos which need to be renovated or reconstructed. These are small structures, used to carry out the road-vehicle traffic through the Olszowiecki Canal. Some of them are located in the Kampinos National Park. CertusVia company has prepared comprehensive technical documentation for the above mentioned facilities.
The parameters of the bridges:
- spans not exceeding 10,0m
- the overall width of each facility approx. 8,2m
Zamawiający
Projekt powstał na zlecenie Wójta Gminy Kampinos.
Data rozpoczęcia i zakończenia
Początek prac projektowych: wrzesień 2016 r.
Zakończenie prac projektowych listopad 2017 r.
Wartość kontraktu
100000,00 zł brutto